What are the main points of construction quality control during the construction of geomembrane composite with non-woven?

Release time:2020-4-7    This article is read :3664 Times

geomembrane composite with non-woven

       What are the main points of construction quality control during the construction of geomembrane composite with non-woven?During the construction of composite geomembrane, regarding the quality control of construction, what are the control points that need our attention? Taian Hongyuan Geosynthetics Co., ltd. is a composite geomembrane wholesaler. The editor will take you to understand the composite geomembrane together. What are the main points of construction quality control during construction!

       1. When the lake bottom is leveled, stones, branches and all sharp and hard objects need to be completely removed to prevent damage to the composite geomembrane. Due to the large water content of the lake bottom soil, the soft parts should be dug out and backfilled to tamping, and the rubber soil should be dug out and backfilled with 3: 7 lime soil.

       2. The laying of the protective layer must be done with a flat shot.

       3. In order to ensure the welding quality of the geomembrane, the weld surface of the geomembrane should be cleaned. Adjust the welding temperature and line welding speed at any time according to the air temperature, wind direction and wind force; often remove the residue of the geomembrane material adhering to the surface of the rubber wheel of the welding machine and the surface of the hot wedge to keep the surface clean; the substrate must be flat and hard when welding. The seam lap surface must be smooth to prevent the weld from wrinkling.

       4. Do not damage the composite geomembrane when laying the protective layer and filling the anchoring end with concrete. After each process is completed, it must be approved by the site supervision engineer before proceeding to the next process.

What are the main points of construction quality control during the construction of geomembrane composite with non-woven?
Previous:Requirement of base surface when laying GCLnext:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.shi-hong.com.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 黑人精品欧美一区二区蜜桃 | 无码AV无码一区二区桃花岛 | a天堂最新资源网址 | 把女人弄爽特黄a大片777 | 久久久精品国产一区 | 男人肌肌捅女人肌肌视频 | 秋霞影视一区二区三区 | 国产精品乱子 | 999国产在线 | 日韩黄色免费观看 | 久久精品18国产99re5 | 久久亚洲aⅴ永久无码精品 精品久久久久久久久久ntr影视 | 国产精品久久久久久久久绿色 | 色欲精品国产一区二区三区AV | 热久久久久香蕉无品码 | 精品国产不卡一区二区三区 | 日韩黄色免费观看 | www.久久国产精品 | 九月婷婷 | 免费看av毛片多人群伦 | 久久艳片 | 亚洲国产精品久久久久久69 | 欧美黑人粗暴多交高潮水最多 | 国产精品久久久久久人妻精品 | 免费一区二区三区在线观看 | 日本老妇性视频 | 亚洲AV无码精品色午夜蜜芽 | 日本三级一区 | 久久精品99久久久久久2456 | 亚洲欧洲老熟女AV | 国产小视频a | www.夜夜 | 亚洲精品三级在线观看 | 麻豆影音 | 久久精品国产亚洲AV嫖农村妇女 | 国产一级强片在线观看av | 久久综合久久自在自线精品自 | 亚洲亚色 | 乱60一70归性欧老妇 | 色情狠久久AV五月综合五月 | 巨大欧美黑人XXXXBBBB |