xf在线a精品一区二区视频网站_久久久久亚洲av无码专区首_国产人妖av_大尺度裸体日韩羞羞xxx_免费在线观看日韩av_麻豆av免费

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

Requirement of base surface when laying GCL

Release time:2020-4-7    This article is read :3187 Times

GCL manufacturer

       Requirement of base surface when laying GCL

       When laying the GCL, what are the laying requirements when laying the base surface? As a GCL manufacturer, Taian Hongyuan Geosynthetics Co., ltd. will take you to understand the GCL when laying. What are the requirements of the base!

       1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL or the upper layer of geosynthetics.

       2. The surface of the foundation soil must be flat and even, and the slope and elevation should be within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements. The base surface should facilitate the laying of GCL, HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

       3. Before laying the GCL, whether the upper surface of the foundation of the soil cushion GCL should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL.

       4. After the daily work, we prepare a signed foundation soil surface permit certificate, which must be signed by the owner ’s representative and then handed over to the supervision engineer.

       5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL that has been accepted becomes unqualified, the installed GCL must be reopened and prepared again 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

Requirement of base surface when laying GCL
Previous:What is the inherent role of geomembrane composite with non-woven anchor?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.shi-hong.com.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 国产日韩免费观看 | 日本精品中文字幕在线不卡 | 毛片一级在线 | 99久久免费看精品国产一区 | 欧美日韩亚洲中文字幕一区二区三区 | 在线观看免费黄色小视频 | 国产剧情AV麻豆香蕉精品 | 亚洲国产成人精品无码区在线网站 | 久久网av | 美州a亚洲一视本频v色道 | 成人视品 | 欧美熟妇色ⅹxxx欧美妇 | 国产95亚洲 | 偷窥xxxx盗摄国产 | 视频成人 | 亚洲AV无码日韩AV无码网站冲 | 成人免费毛片内射美女-百度 | 国产精品久草 | 黄色天堂在线观看 | 凌晨三点免费视频www | 亚洲综合五区 | 亚洲日日摸夜夜夜夜夜爽小说 | 一区视频免费观看 | 欧美亚洲小视频 | 欧美国产成人精品二区芒果视频 | 欧美少妇在线观看 | 国产福利一区二区三区在线视频 | 精品在线观看一区二区 | 国产在线不卡精品网站 | 亚洲精品综合第一国产综合 | 各种场合大胆露出在线看 | 中文字幕无码肉感爆乳在线 | 国产日韩精品中文字无码樱花 | 亚洲韩国欧洲国产日产av | 欧美日韩国产色综合视频 | 日韩精品无码久久一区二区三 | 天天综合网网欲色 | 日本男人天堂 | 国产www网站| 国产精品午夜爆乳美女 | 日本激情视频在线播放 |