xf在线a精品一区二区视频网站_久久久久亚洲av无码专区首_国产人妖av_大尺度裸体日韩羞羞xxx_免费在线观看日韩av_麻豆av免费

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :3963 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.shi-hong.com.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 国产亚洲精品麻豆一区二区 | 国产亚洲福利精品一区 | wwwwxxxxx日本| 看一级黄色毛片 | 亚洲国产精品va在线看黑人动漫 | 欧美精品99 | 中文无码久久精品 | yellow高清在线观看大全 | 精品久久久一区二区 | 好大好硬好湿免费视频 | 国产精品无码一区二区三区无卡 | 国产一片姪乱洗澡 | 一区二区三区日本 | 99久久国产免费大片 | 国产下药迷晕一区二区三区在线看 | 亚洲黄色性视频 | 国产精品视频麻豆 | 一个人看的www视频免费播放 | 又黄又粗又爽免费观看 | 日本一区二区不卡在线 | 成人国产精品一区在线观看播放 | 免费a国产 | 精品国产免费久久久久久尖叫 | 国产日韩欧美在线一区 | 亚洲日本黄色片 | 男女一边摸一边做爽爽的免费软件 | 爱唯侦察国产合集亚洲 | 天天看逼 | 日本第一页 | 国产极品白嫩精品 | 最新视频-x88av | 日产日韩亚洲欧美综合 | 亚洲最新无码中文字幕久久 | 国产精品午夜一区二区欲梦 | 特级黄色片免费看 | 床震吃胸膜奶免费视频 | 伊人色综合久久天天网图片 | 人妻少妇精品无码专区 | 亚洲最新在线视频 | 插插无码视频大全不卡网站 | 成人水多啪啪片 |