xf在线a精品一区二区视频网站_久久久久亚洲av无码专区首_国产人妖av_大尺度裸体日韩羞羞xxx_免费在线观看日韩av_麻豆av免费

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

Technical Services Current Position:Home > Technical Services

Precautions for GCL construction

Release time:2020-4-7    This article is read :5106 Times

GCL construction

Precautions for GCL construction

1. The site should be kept relatively dry during construction, and the base surface can be wet, but there should be no water accumulation.

2. The laying, connection and interface of the GCL should meet the design requirements and construction specifications, and be firm and stable, without hollowing, damage, slippage, warping, wrinkling and other phenomena.

3. If the impermeable blanket is damaged during the laying process, a pair of GCLs larger than the damaged surface by 30cm ~ 50cm must be cut and covered, and the surrounding area should be coated with bentonite waterproof slurry. 4. After the GCL is laid and inspected, the construction of backfill shall be carried out simultaneously to avoid trample and damage.

5. The GCLs should be stacked in the designated place on the site, and be cushioned to maintain a certain distance from the ground, and covered with plastic film to avoid rainwater immersion, sunlight and moisture.

6. If it rains during the construction process, it should be covered immediately with plastic film materials or rain shielding materials to avoid rainwater soaking and washing the waterproof layer and affecting the construction quality. When the rain is large and the bentonite swells by more than 300%, it should be laid again.

7. The equipment or truck cannot be placed directly on the GCL, and the cover must be set to work.

8. When laying, it is strictly forbidden to put an open flame or cigarette butt on any side of the GCL, and it is strictly forbidden for construction personnel to wear spike shoes.

9. During the construction, if the construction party encounters unclear drawings or the construction site does not conform to the design of the drawings, it should be notified to the designer in time and properly resolved through consultation.

10. For other unfinished matters, the national and local acceptance standards and operating specifications shall be followed during construction.

Precautions for GCL construction
Previous:Comparative analysis of several geotextile materialsnext:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.shi-hong.com.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 東热精品中字久久无码五月天 | 欧美18videosex性欧美tube1080 | 精品欧美不卡一区二区在线观看 | 免费黄色福利网站 | 91看片 | 亚洲成AV人片天堂网久久 | 最新日韩AV网址在线观看 | 波多野结衣在线视频一区二区三区 | 国产精品三级在线观看 | 日本成人高清视频 | 亚洲美女视频网站 | 欧美日韩偷拍一区 | 91成年视频 | 亚洲AV永久无码天堂网国产 | 国产精品裸体一区二区三区 | 人与禽性视频7777 | 亚洲一级视频在线观看 | 色呦呦麻豆 | 免费看国产一级特黄aaaa大片 | 中国亚州女人69内射少妇 | 国产下药迷晕一区二区三区在线看 | 自拍私拍网友真实视频 | 欧洲国产精品无码专区影院 | 国产专区在线视频 | 日本视频在线看 | 精品国产乱码一区二区三区麻豆 | 久久中文字幕一区二区三区 | 久久国产精品久久久 | 女人高潮一级一片 | 免费小视频在线观看 | 欧美专区在线 | 暴力调教一区二区三区 | 精品久久AⅤ人妻中文字幕 国产高清无码黄片亚洲大尺度视频 | 精品无码一区二区三区在线 | 久久超乳爆乳中文字幕 | 国产激情高中生呻吟视频 | 久久综合九色综合国产 | 欧美少妇在线观看 | 岛国毛片 | 十八禁无码免费网站 | 秋霞午夜av一区二区三区 |