xf在线a精品一区二区视频网站_久久久久亚洲av无码专区首_国产人妖av_大尺度裸体日韩羞羞xxx_免费在线观看日韩av_麻豆av免费

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :3963 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.shi-hong.com.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: www啦啦啦视频在线观看免费 | 国产偷久久一级精品 | 91夜夜蜜桃臀一区二区三区 | 少妇xxxxx性开放 | 38激情网 | 在线国产精品一区 | 人成在线免费网站 | 九九re6热在线视频精品66 | 亚洲瑟瑟 | 中文字幕无码肉感爆乳在线 | 国产一及片| a在线免费看 | 免费av网站在线观看 | 中文无码一区二区视频在线播放 | 狠狠色丁香婷婷综合久久来来去 | 真人在线观看色网视频 | 国产精品无码无卡在线观看久 | 国产精品一区高清 | 日本亚洲欧洲色α | 欧美性受xxxx黑人猛交88 | 久久热这里只有精品在线观看 | 欧美性福 | MM1313亚洲国产精品 | 国内精品人妻无码久久久影院蜜桃 | 一级毛片色一级 | 国产精品视频麻豆 | 三级免费久久无码 | 美女胸18下看禁止免费视频51 | 国产在线欧美日韩精品一区 | 精品国产入口麻豆 | 亚洲色图狠狠爱 | 草久在线视频 | 日本欧美一区二区三区视频麻豆 | 野花社区www官网在线观看 | 一女被两男吃奶玩乳尖 | 欧美在线另类 | 在线不卡中文 | 欧美日韩国产人妻无码 | 黑人巨大两根一起挤进交换 | 国产草莓视频无码A在线观看 | 国产免费一级片 |