xf在线a精品一区二区视频网站_久久久久亚洲av无码专区首_国产人妖av_大尺度裸体日韩羞羞xxx_免费在线观看日韩av_麻豆av免费

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

Requirement of base surface when laying GCL

Release time:2020-4-7    This article is read :3187 Times

GCL manufacturer

       Requirement of base surface when laying GCL

       When laying the GCL, what are the laying requirements when laying the base surface? As a GCL manufacturer, Taian Hongyuan Geosynthetics Co., ltd. will take you to understand the GCL when laying. What are the requirements of the base!

       1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL or the upper layer of geosynthetics.

       2. The surface of the foundation soil must be flat and even, and the slope and elevation should be within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements. The base surface should facilitate the laying of GCL, HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

       3. Before laying the GCL, whether the upper surface of the foundation of the soil cushion GCL should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL.

       4. After the daily work, we prepare a signed foundation soil surface permit certificate, which must be signed by the owner ’s representative and then handed over to the supervision engineer.

       5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL that has been accepted becomes unqualified, the installed GCL must be reopened and prepared again 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

Requirement of base surface when laying GCL
Previous:What is the inherent role of geomembrane composite with non-woven anchor?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.shi-hong.com.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 国产三级精品三级在专区 | 欧美国产日韩在线 | 伊人免费视频 | 色se02短视频永久网站 | 亚洲欧美日韩综合在线丁香 | 夜夜夜草视频 | 亚洲第一天堂影院 | 欧美人c交zoozooxx | 国产A∨天天免费观看美女 亚洲精品7777 | 久久久久人妻精品区一三寸 | 午夜秒播 | 久久中文字幕一区二区三区 | 亚洲a在线播放 | 天天操操操操 | 男女性色大片免费网站 | 麻豆福利视频 | 日本hdxxxx少妇1819 | 精品国产乱码一区二区三区麻豆 | 扒开双腿猛进入喷水高潮视频 | 精品精品国产高清a毛片 | 天天色天天射天天操 | 国产欧美精品在线观看 | 毛片无码一区二区三区a片视频 | 欧美性猛交xxxx免费看德国 | 亚洲爆乳少妇无码激情 | 亚洲图色欧美另类小说 | 第一区视频 | 亚洲小视频网站 | 青青网视频 | 香蕉视频官网 | jmcomic2最新安装包 | 日本一区二区不卡在线 | 久久久久亚洲精品乱码按摩 | 3344成人免费高清免费视频 | 亚洲av日韩av永久无码不卡 | 夜夜爽夜夜叫夜夜高潮 | 久久AV老司机精品网站导航 | 性视频一区二区三区 | 在线观看黄色片 | 亚洲成AV人片一区二区密柚 | 国产一区二区三区18 |